Журнал «Современная Наука»

Russian (CIS)English (United Kingdom)
MOSCOW +7(495)-142-86-81

Analysis of existing approaches to compiling repair schedule at the enterprise

Bazhenov Petr Alekseevich  (Graduate student Federal State Autonomous Educational Institution of Higher Education "Perm National Research Polytechnic University")

This article discusses network planning as a method of organizing work in enterprises. The statement of the problem of network planning is given, and the analysis of methods for solving this problem is carried out. Based on the results of a review of existing methods and approaches, it can be concluded that, at the moment, there is no such method for scheduling repair work and ore mining at a mining enterprise that would take into account the current state of equipment in the specifics of mine workings.

Keywords:repair scheduling, network planning, critical path, duration of work, heuristic methods, equipment condition.

 

Read the full article …



Citation link:
Bazhenov P. A. Analysis of existing approaches to compiling repair schedule at the enterprise // Современная наука: актуальные проблемы теории и практики. Серия: Естественные и Технические Науки. -2022. -№10. -С. 52-56 DOI 10.37882/2223-2966.2022.10.03
LEGAL INFORMATION:
Reproduction of materials is permitted only for non-commercial purposes with reference to the original publication. Protected by the laws of the Russian Federation. Any violations of the law are prosecuted.
© ООО "Научные технологии"